I would like to clarify the following:
1. day of the incident on (17/09) KH had complaint, and as noted above, I immediately reported the situation to Ms Thuyntl, she sure will check the causes and to propose the best solution for KH. I did notice the same with science, and science agree to wait after compensation. (this period also stop all the camps Plan to fix website).
2. Ever, all of the scientific camp after being setup to always pause mode, then I check your report before activating KH running (you can check the history of all work, both the first support Ms Thuynth are notes or pause the campaign after the setup) - and the campaign of the incident, you can see Ms Thuynth did note campaign stop after setting up (comments: 105). On the issue of "note campaign stops after setup," then I do not have anything to debate here, because everything was made very clear to see.
3. 17/09 morning I check the KH campaign saw 267 101 camp was run at more than 4M and didnt setup for this campaign budget (as required the same to all targeting information "CHARITY removing tooth BANNER 1" camp => = 2M budget & S never before to no limit on the budget at all - this is what makes me feel very strange if this self-tuning such KH). That's what makes me revise budget limit = 2M.
I would like to note one more thing is that with this science, I pretty much supported and supporter, we regularly communicate via skype, should be one of our problems forgot to comment on the ticket, but certainly one that is no misunderstanding / misinterpretation attention between me and Ms Thuynth. So the problem above is completely unwanted, and you can also see Ms Thuynth has supported my best setup for KH many times already. So I very much hope you can consider this case and can we như sorry abt coupons for the client?
đang được dịch, vui lòng đợi..
