3. Arrange the total ground construction:
Arrangement of the work site based on the total ground construction drawing design construction engineering, construction sequence of items set out, taking into consideration the requirements and safety regulations on construction, environmental sanitation, anti-dust, noise, fire protection, security, guarantee does not affect the operation of the surrounding area.
on the total surface demonstrated construction location of items, location of equipment, machinery, machining park formwork, reinforcing steel, cement depots, reinforcement, construction tools, construction of temporary roads, power line system, water used in construction, housing systems, temporary camps for officers and employees (see layout drawing of the total building space).