-This 5: The rights and obligations of the parties
' rights and obligations of Party A:
• Party A may not if the acceptance of Party B is not in accordance with the design & sample profile was the A browser or quality not previously met the requirements.
• Suggest halt production, construction when party B deems not to comply with the agreements under the terms of this contract.
• There is the obligation to prepare to hand over construction in time, the handover source and payment of electricity, water (before the start), guiding positions of
power system connection, water for construction work.
• Provide adequate information, contents Party B offices to better service for
the construction work (drawing current situation, construction design drawings related items).
• appoint a representative shall have regularly seen at work to keep
track the progress and quality of construction.
• Confirm if volumes arising as a basis for acceptance and payment in the future.
• payments in accordance with the content of the Addendum.
• Signing the minutes of audio contract Management notified by Party B, within 02 days of receiving the notice.
• Arrange warehousing and dispatching goods rallies protect supervise the works inside and outside working hours.