• Step 10: stuffed into concrete Pump pipe. The direction opposite to the top Arch of the foot pump arch. At the same time concrete pour was so enraged that horizontal systems• Step 11: create the tension force in the second pull rod • Step 4: Hang the cable hanging bar and the horizontal beams I, works at the same time from 2 sides. Then proceed to drag tension prestressed cable horizontal beams as the prestressed concrete beams. • Step 13: Create tension forces in drag for the third• Step 14: horizontal beams Hanging recruitment (the number of the remaining beams) construction 2 banks simultaneously. Prestressed cables tension of horizontal beams