By design, the time to stop water connections up to 15 hours. Through meeting on 06/7/2016 of Enterprise Transmission Water management unit D600 concrete pipe had agreed that the proposed construction unit rework process water withdrawal period for construction of connections 08 hours is the total Saigon water supply company limited A member State approval for connection closing date.
đang được dịch, vui lòng đợi..