The decision to Base Commander Army Corps: 1229/QD-BTL, on 21/5/2013 approving construction drawing design, estimation of the projects in the package is 4; number 1377/QD-BTL, 5/08/2015 of the Corps approving construction drawing design, estimation of the projects in packages of 5, 6, 7; No. 47/QD-BTL, 7/1/2016 approving the design, engineering, estimating the technology part of the factory production in packages of 5, 6, 7 – the migration project and construction investment Z756/BCCB;