Currently you check the requirements of the MOC
- 1. Requires verification of design documents and construction for suspension, electrical -> Booth to prepare design documents - construction, must be closed record verification sealing design for suspension, electrical, section I saw the booth can not be performed.
- 2 - Call supervision consultants, signing acceptance documents, test records, stamped completion -> PP may support the booth.
- 3 - Profile quality control booth by decree 46/2015 / ND-CP follow you see the booth except CGV will not perform achieved
- 3- Dear required certificate of conformity - Table calculated check the stability of the glass wall systems, structural verification -> the booths were not done, the PP had no such verification functions.
can you help me first consulting unit can worry helps me be more of the above, let me first process, the booth must prepare what, cost, scope of work for me to work with stall on this issue.
đang được dịch, vui lòng đợi..