. Sections of the River from Binh Phuoc bridge to the Saigon bridge Sections of the River from Binh Phuoc bridge to the Saigon bridge has a length of 22 km, have more bend, rather narrow river with a width varying from 220m 230m. The survey results showed that this has River passage near the 04km been scoured with different levels located in Thu Duc district, District 2, District 12 and Thanh da Peninsula area-Binh Thanh. General the avalanche over the years shows that most of the River was scoured, are located on the bend of the river such as :-11/2000, Binh Phuoc Bridge 1, 5 km to the upstream, a block away in the House Hope its restaurant scene has been sạt down the River with length 250m, width of about 15 m. At present, the road section of this coast are still at risk of avalanche at any time.-On 31/5/2001, at 58A and 277A, group 3, 1st quarter Hiep Binh Phuoc Ward, Thu Duc district were scoured with a length of 100 m, a width of about 15 m. Damage to the property of lime base Tan Phat (277A) is estimated at 200 million. Currently, on the banks of the still a crack about 20 m long and fairly broad segment of this coast Association Norway are.-Ramp right coast hamlet of Binh Phuoc in Binh Phuoc Bridge 1, right in the area of the factory is the concave shore of Indira Gandhi jute of river bend about 250m are being scoured with an average speed of about 2, 2 m/year.-Ramp in Binh Phuoc 3 Hamlet, coast, right at the fork of the Saigon River two-slit Bridges and Saigon River-slit Cork Bridge with a length of around 200 m are being scoured with an average speed of about 0, 8 m/year.-The ramp at Fantima Church area, Binh Loi bridge about 350 m to the upstream with a length of 300 m was 7 years ago, and the avalanche have been building the embankment protecting the banks quite solidly.-The average bridge Bank section of the road is about 80 m to the Millions with a length of 50 m, also are being scoured with an average speed of about 0, 7 m/year.-Shoreline in Thanh da Peninsula area in Ward 22, Binh Thanh district, 28, has a total length of about 01km in recent years suffered serious avalanche. This is a very densely populated area should the House and found the Cafe grows.
đang được dịch, vui lòng đợi..
