Air chiller of the factory, there are 3 existing chiller. the plan was outlined is split 2 chiller system needs replacing, take it out of the engine room, then put the new chiller in position In addition, the need to connect the chiller the right back into the system to ensure the Van Hanh's factory during the installation of the new chiller.The remarkable thing is, this work requires to be completed during the 24 h must also ensure the safety of labor process very strictly of the plant