Send!Demonstration projects:1. Planning the total MB:-2 separate pick Hall for Showroom space and apartment blocks, 1 selling floor walkway tunnel. The main hall designed to lift Costa 1, 28m compared to the pavement2. The functions of each floor:-Basement held 1 ramps connected to the main roads and ramps connect the existing residential area.-Floor space sold the tunnel to parking (09: fixed seats), the engineering room layout (pumps, generators, etc.). 1 elevator and stairs. The height of the selling floor tunnel expected 3, 19 m marine assurance to the car, run the pipeline engineering and the height of the walkway of the vehicle (> = 2, 2 m).-1st floor: Hall 2 layout individually serve the apartment blocks and Showroom kg. Kg the priority access to Showroom lane width 1.5 m to take the light and airy combined layout 1 mezzanine office space, warehouse and sanitary system comes. Apartment with separate lounge kg Showroom, include: foyer, reception, rooms, area management and hygiene. Elevator designed with load 630kg (8 people), use the elevator, combined with information from the roof down to the floor space (area) to create a bright and airy staircase for the whole of the first floor lobby. In the first floor layout of small landscape after the stairs. Floor height expected 5, 4 m, make sure the height created the luxury for the shuttle, lounge area and showroom space for mezzanine.-2nd floor: 2 apartments and modern facilities. Throughout the design point is all the space in the room must be ventilated and natural lighting. From the lounge floor into the apartment layout 1 amount to cabinets, shoes, create privacy for kg. Kg-rooms connected to the dining room is spacious and overlooking a large balcony. Kg stove near the dining room, and the link with the airy drying laundry kg. Kg dry drying spin out of the area and information are protected by blue system overlaid to create aesthetic. 3 bedroom with en suite, there are also hygiene areas serving 1st common space.-Floor 3, 4: Apartment/4 design, with design thinking and perspective similar to the 2nd floor. Each apartment also includes a full range of space such as living room, dining room, stove, oven drying, toilet and 2 bedrooms of which 1 bedroom with en suite.3. About technical solutions:-Structural solution using reinforced concrete frames (foundations, columns, beams, floor). combine the wall covering of brick construction.-Water supply and drainage according to standards. Water supply: can use hot underground water pump up the roof, and then from the roof taken down the floor to use. Drainage: the space from floor to roof, natural drainage, septic sale floor basement. Sale-floor basement has water collecting grooves system overflow at the top and foot of the slope, ram along with floor water collection system be forced pump.-Mechanical and electrical systems, heavy electrical, electric light (information systems, internet, cable ...). The system can deploy intelligent building management, lock the doors, Elevator light code card. ...-Air conditioning system locally or multi (1 mother many children), the hot Department hangs in the laundry space exposure so as not to affect the architecture works.* Note: there are many functions (including apartments and Showroom), floor in typical design should not design for post is somewhat difficult, more architectural solutions in 197 Hang just right with the old town and the old town of Hanoi where the impact of the colonial architecture or in France. On the other hand, the work is the House in hot climates will have to achieve a minimum of 2 target: apartment with large and airy but need to ensure for the whole project. The rate of the doorway in French architecture is often small and long, the advantages of French architecture can take on the thick wall, here is the solution against noise and heat resistant. I choose Italy SVO, if so advice they still look forward to French architecture we still meet, there's something I still desire 1 modern housing architecture, in line with the forecast, and fit the long-term brand building.
đang được dịch, vui lòng đợi..