Dear
initial design drawings without ACS and ceiling 2nd floor room had 2 punctures techniques (which have been frozen clouds attached drawings). On request, we have added rooms ACS on architectural drawings attached. We need to solve the following problems:
1. Part technical holes in the ceiling 2nd floor room had any effect on ACS?
2. Lead replacement wall section height?
đang được dịch, vui lòng đợi..
