according to meeting with him and his Seksan pitichai, we do not discuss the construction of the air conditioning system as described above him.
We just promised to support free labor section includes: System network cable, wire 3-room docking station and workshop areas nah2, 2 circuit breaker installed in the office 2A.
After that we continue to have met his meetings to explain the part Pitichai quote.
In this meeting, Mr. pitichai have việ additional DB2 install electrical cabinet but did not discuss the air conditioning systems work.
We have enthusiastically supported the gentleman in the calculation of the volume fraction overtime work and support free labor .
We will not support additional works not included in the meeting
đang được dịch, vui lòng đợi..
