to avoid the sticky glue on the carousel so workers had to use data "Reform 300 + CO / 300 1M * 1.45M" (for counter) to make pads for the shoes being put through the presses.
Is this used medium average 1-2 days (maximum of 1 week), change (as difficult to clean)
this situation does not waste material but more effective, more than 10 sheets per pass needed
đang được dịch, vui lòng đợi..
