Based on the calculated volume, acceptance of the payment period (No. 1 to No. 7) Contractors and Consultants that have worked. Volume supervision consultant is calculated according to accepted practice, according to design drawings. Such is not true to the form of package deal, and Decree No. 85/2009 dated 15/10/2009.
đang được dịch, vui lòng đợi..