4.3: drainage:The drainage system was designed with thíêt waste water drainage system.a, drainage:Rain water is collected by manholes into the sewer system + the total length O600 O300 sewer is 6,150 m, then the drainage route for the municipality.b, sewer:Wastewater in the works are to be processed in the factory to the local septic tank, then pour out the pipes leading to the clearing station o300 planning, before release.O300 tube size + the total length of the line is the o400 15.620 m.Waste water treatment station for 440m3/ngđ.4.4: water supply: The source of the water taken from the water pipe on the route 328.The whole water supply capacity calculation is approximately 950m3/ngđ.Pipe size o60 + the total length of the route is o114 16,060 m.4.5: power supply:Power supply for the project taken from power on provincial road 328. The network of lines that lead to the construction in the area using low voltage underground cable system C/XLPE/PVC/PVC/PVC threaded DATA go in the turn put cabinets divided into electricity. 5. Implementation:-3rd quarter II/2013: Submission and approval of the project;-From the second quarter + IV/2013: Establishment and approval of investment projects;-From 2014 + 2015: construction WORK of the system and the process of phase 1;-Projected to 2016: Take the stage 1 on business;-From 2016 + 2017: construction of the remaining works;-2018: Put the whole project into operation.Article 2: Fisheries Ltd., Dawn is the owner is responsible for:1-submission of approved projects for the Department of construction, Dpc Xuyên, Xuyên district Economic Infrastructure, Phuoc Thuan PEOPLE COMMITTEE within 30 days from the date of the approved plan;2-coordination with Dpc Xuyên, Phuoc Thuan village to publicly resign his to963 plans, insert the drawing boards side by General pano planned construction area to publicly for people to make and test the implementation; organize the deployment of border demarcation on field QHXD;3-organization implementing project construction investment in the proper planning of article 1 of this decision and other investment management current construction.Article 3: DPC Xuyên is responsible for guiding and tracking, check the investment and construction in the area in accordance with article 1 of this decision and make the task of managing the construction according to the current rules.Building facility in collaboration with the Department of natural resources and environment, DPC Xuyên, management of natural reserve Peng Chau-Fuk Bữu, and the related industry guide, test, monitor, built according to the approved plan; Shu master plan management functions built in accordance with current regulations.Article 4: Chief of the PPC, the Chairman of the district Gia1m, Director of the Moc Department of Piercing: building and Construction, investment, resources and the environment, agriculture and rural development, culture, sports and tourism, Director of management of natural reserve Peng Chau-Fuk Bữu Gia1m, Director of Fisheries Ltd., Dawn , and the heads of the relevant units responsible for the implementation of this decision.Where to get:-Article 4-Chairman, the Vice Chairman of the PROVINCIAL PEOPLE'S COMMITTEE-Save The VT-TH.
đang được dịch, vui lòng đợi..