be made in accordance with the "outline of the tasks, technical surveys-hydrography".-Class II traverse plan control network and technical elevation coordinate system established by the State.-The real work is done in accordance with the standard rules, road survey and measurement rules of the General Directorate of Cadastral while ensuring requested technical outline agreedIII. RECOMMENDATIONSDuring the measurements, check what's wrong with other surveys report should inform the owner, design consultant, supervising to the same resolution.
đang được dịch, vui lòng đợi..