According to the Ministry of transport, high speed project, bien Hoa-Vung Tau designed to standard class A, highway design speed of 100-120 km/hour, the scale 4-8 lanes. Full length online about 77, 87km, out of which 66, 05km high speed standard, the rest is the the connection and the main streets of the town. The line connects with the road to avoid a route avoiding the city of bien Hoa, Vung Tau junction 6, 5 km. The last point at km 68 + 670-Phu Hoa-segment of Highway 51. The total investment of the whole project about 24,478 billion.
đang được dịch, vui lòng đợi..
