Based on the letter No. KLHA-0001 on 27/07/2016 of KUMHO, we reply comments as follows:1. To request the calculation capacity of transformer for pumping waste water treatment plant to the North: -Power substation in the pump station No. 1, no. 2 pump station and pump station No. 3 is calculated as attachments, referenced according to the parameters selected for the pump stations. Through the calculation results, substation for pump station 1 is 320kVA, pump station 2 is pump station 3, 50kVA is 75kVA.-For pump station No. 1, according to the results of calculations, substation capacity of 1 by design is 180kVA is not consistent with the amount of load current consumption.