After the installation of the pipes and drainage in the standby position, equipment connections need dedicated buttons by tube to avoid gravel tiles fall into the pipeline shut down after this
after laying water and sewage pipes in the standby position connected devices, need to cover it with dedicated buttons to avoid stones falling bricks as the pipe off later