Besides, waste remains contained in the temporary outdoor deployed at burying two, numbers were 4, 5, 6, 7, 9. Do the box buried two construction stages yet to come and receive spam should be arranged into makeshift sewage reservoir when the amount of the increased wastewater wastewater treatment systems that have yet to catch up with the handle. Wastewater from the temporary Lake is regularly pumped about 2 main Lake number 1 and 2. Currently, USING VWS are building more sewage processing module with a capacity of 2000 m 3/day with the aim of handling thorough the entire amount of water generated more when the next rainy season. As soon as there is the need to build additional burial box number 2 to receive spam, then USING VWS will stop on the waste water pump on this makeshift reservoirs.Construct lining the bottom of the makeshift sewage reservoir in the box buried two similar outdoor number 1 and 2, as only temporary water storage in the short time should ignore the repellent Wicks stand and collectors of groundwater. The Lake has a 2:1 slope.
đang được dịch, vui lòng đợi..