In the letter referenced above, Daelim requirements demand 17 enterprises accelerate the design and construction drawings completed by the end of October 2015. However, as you have known the design unit Britec withdrawal from the project, enterprises have been striving to bridge 17 units of new design and contracting to catch up to schedule, the new design costs 2 times the cost of the original design. Enterprise 17 players will try to meet the design schedule required by Daelim is late October 2015, however some items separately difficult and entangled ground as the ring road flyover 2, please elite river bridges was repulsed end design in December 2015 (see detailed schedule of construction drawing design submissions).
The progress of the design made on the basis not of the interface problems with other packages and errors of design flaws that actual engineering firms Daelim and bridge 17 also does not resolve. So progress may be adjusted according to the agreement of the parties.
We wish the prime contractor Daelim consider and approve the design progress of this construction drawings.
đang được dịch, vui lòng đợi..