YUKIO SUZUKI CAM-JAP DEVELOPMENT COMMUNITYCJCD CITY DEVELOPMENT CO., L dịch - YUKIO SUZUKI CAM-JAP DEVELOPMENT COMMUNITYCJCD CITY DEVELOPMENT CO., L Anh làm thế nào để nói

YUKIO SUZUKI CAM-JAP DEVELOPMENT CO





YUKIO SUZUKI CAM-JAP DEVELOPMENT COMMUNITY
CJCD CITY DEVELOPMENT CO., LTD

--------









MEMORANDUM OF UNDERSTANDING ON

The Delivery – Acceptance of services for leveling sand pump to the building site along National Road 1 at Kilometer No. 53, geographically located in Kampong Phnom and Preaek Tonloap Communes, Leuk Daek District, Kandal Province, on land area ……….…………… (…………………………thousand) Hectares and on the project construction contract within the above mentioned city development building site.



No.: …………………… Phnom Penh, January 20th, 2014



This agreement is executed by


Between


- The Company: LY PICH SAMNANG APHIVATH CO., LTD.

- Represented by: Mrs.LY NARY
- Passport No.: ……………………………………………………………………………………………………………………..
- Office address: ……………………………………………………………………………………………………………..……
- Telephone/desk phone: ………………………………………………………………………………………………..…..
-Email:…………………………………………………………………………………………………………………………………
- Name of bank: ……………………………………………………………………………………………………….………….
- Address: …………………………………………………………………………………………………………………………….
- Account name: …………………………………………………………………………………………………..………………
- SWIFT: ………………………………………………………………………………………………………………….……………
- Bank telephone: …………………………………………………………………………………………….…………………..
- Bank fax: …………………………………………………………………………………………………………………………….

The principal, hereinafter referred to as Party “A”



And


- The Company: BANG ZHOU MARINE ENGINEERING CO., LTD



- Represented by: MR.CHEN CHUAN YUNG
- Passport No.: ……………………………………………………………………………………………………………………….
- Office address: ……………………………………………………………………..............
- Telephone/desk phone: ……………………………………………………………………………………………………….
- Email:…………………………………………………………………………………………………………………………………..
- Name of bank: ……………………………………………………………………………………………………………………..
- Address: ……………………………………………………………………………………………………………………………….
- Bank account No.: ………………………………………………………………………………………………………………..
- SWIFT: ………………………………………………………………………………………………………………………………….
- Bank telephone: …………………………………………………………………………………………………………………..
- Bank fax: ………………………………………………………………………………………………………………………………

The contractor, hereinafter referred to as Party “B”



References:
- Letter of Authorization No.: ………………..….. dated ……….………….. of the Council of Ministers,
- Sub-decree No.: ………………… dated ……………………………., 2012, on the Investment Approval,
- Partnership Agreement No.: …………………………………………………………………………………………….
- Record of Inspection of Sand Dredging Machineries is ……………, dated ………………….., 2013
Now therefore, the two Parties hereby agree on the following terms and conditions: Article 1: Purpose of this MOU

1.1. This Agreement sets forth the memorandum of understanding on the delivery- acceptance of services of sand pumping to the reclamation site and for the construction project in the so-called development site. In this agreement,
- Party “A” as the Principal
- Party “B” as the contractor to provide the sand dredging and construction services (canal,
canal bank, road, bridge, housing residents, factory, drainage system…)

1.2. Party “A” agrees to award the contract for provision of services of sand dredging to the reclamation site on …………………(………………………thousand) hectares to conduct the feasibility study of the construction project (canal, edge of the canal, road, bridge, factory and residential buildings…) as well as of the infrastructures existing within the said development project which is geographically located on National Road 1 at kilometer No. 53 in Kandal province’s Kampong Phnom and Preaek Tonloap Communes, Leuk Daek District.

1.3. The two Parties mutually agreed on the service fee for sand pumping to the reclamation site at ……………… USD (………………………………...dollars) per cubic meter with a distance to be



calculated form the dredging site to the end of the reclamation site boundary; the length of which shall be no more than 13km.

1.4. Upon completion of the sand pumping, filling in and leveling of the site to the same level of National Road 1 by Party “B”, Party “B” shall proceed with the feasibility study of the construction project; the duration of which shall be for 20 (Twenty) days. Upon completion of the project feasibility study by Party “B” in collaboration with the agents and qualified engineers named by Party “A”, Party “B” shall present the report of Bill of Quantity (BQQ), samples and technical specifications and engineering materials to Party “A”. And within 9 working days after the submission of the project feasibility study documents to Party “A”, the two Parties shall agree on the date to determine the possibility of study on the construction contractor agreement and the signing of the contract on the following date.
Both Parties shall discuss and adopt the plan stating the followings:
- The payment guaranty
- The phases of payment
- The construction and compliance with the standard for such construction
- The warranty on construction quality
-Technical, material and engineering practice
- The compliance with the law on construction and other laws covering the development in this area.
1.5. The canal rehabilitation and building of edge of the canal shall be commenced during
the sand dredging operation for the reclamation site in order to avoid the sand from flowing into the dug canal site (the project of canal rehabilitation and building of edge of the canal, which is attached as Annex 1 to the contract on sand pumping for the reclamation site).

1.6. Party “B” shall conduct a field study on the sand mining site and the site to which the dredging machineries are to be transported, inspect the site where the pipeline is to be installed and conduct the evaluation before the report is to be finally submitted to Party “A”.

Article 2: Development Project Site, duration of the project study and evaluation

2.1. Site: The development project is located on along National Road 1 at Kilometer No. 53, geographically located in Kampong Phnom and Preaek Tonloap Communes, Leuk Daek District, Kandal Province.

2.2. Duration of the Study: Party “B” shall complete the project study within a period of 20 (Twenty) days following the confirmation in approval by Party “B” of Party “A”’s source of capital.

In case Party “B” reasonably believes it cannot complete the project study within the schedule set above, Party “A” shall be notified in order to negotiate on the delay of the study for any appropriate period and to give time for Party “A” to decide on the extension of the project study as proposed by Party “B”.

2.3. Fees for the project study: The service fees shall cover the followings:
o The study on the sand pumping site
o The study on the canal rehabilitation project
o The study on edge of the canal building project



o The study on the road construction and establishing gardens along the canal project
o The study on bridge construction project
o The study on drainage-sewage system and waste water treatment plant project

Party “B” shall cover the costs for study on any project chosen by Party “B”.


Article 3: Responsibilities of Party “A”

3.1. To present to Party “B” any legal documents concerning the development project;

3.2. To provide cooperation and coordination for Party “B” during the project study period
covered under this agreement;

3.3. To be liable for due and timely payment according to the schedule set in the sand pumping contract and construction contractor agreement, respectively;

3.4. To furnish the regional map pointing out the development project site and construction plan as specified in the project.

Article 4: Responsibilities of Party “B”

4.1. To conduct study for each project as instructed by Party “A”,

4.2. To study the project and prepare report on the study progress for Party “A”,

4.3. To issue the list of equipments, machineries and staffs to Party “A”,

4.4. To issue confirmation of the financial capacity of contract for sand Party “A”, which is a must, upon the signing of contract for sand pumping to the reclamation site and/ or of the construction contractor agreement,

4.5. To be responsible for ensuring both the quality and safety meets the international standard during the construction.

ARTICLE 5 : The Capital 's Party " A "

5.1. The Capital 's the " A " grade for party " B " shall be checked through the list of account development project of CJCD City Development Co., Ltd. one hour before the signing of Memorandum of Agreement (MOA) for contractors leveling sand pump and construction.


ARTICLE 6 : Capital sources secured for the leveling sand pump and constructions of the “B"

6.1. Capital sources secured for the leveling sand pump:

Party " B " is not elevated amount of items to ensure the leveling sand pump but party " B " to make sure of the possibility and potential of the construct
0/5000
Từ: -
Sang: -
Kết quả (Anh) 1: [Sao chép]
Sao chép!
YUKIO SUZUKI CAM-JAP DEVELOPMENT COMMUNITYCJCD CITY DEVELOPMENT CO., LTD.--------MEMORANDUM OF UNDERSTANDING ONThe Delivery-Acceptance of services for leveling sand pump to the building site along National Road 1 at Kilometer No. 53, geographically located in Kampong Phnom and Tonloap Communes, Preaek Leuk Daek district District, Kandal Province, on land area ......................... (.............................. thousand) Hectares and on the project's construction contract within the above mentioned city development building site.No.: …………………… Phnom Penh, January 20th, 2014This agreement is executed byBetween-The Company: LY SAMNANG PICH APHIVATH Co., Ltd.-Represented: Mrs.LY NARY- Passport No.: ……………………………………………………………………………………………………………………..-Office address:...................................................................................................................................-Telephone/desk phone:...................................................................................................................-Email:…………………………………………………………………………………………………………………………………- Name of bank: ……………………………………………………………………………………………………….………….- Address: …………………………………………………………………………………………………………………………….- Account name: …………………………………………………………………………………………………..………………- SWIFT: ………………………………………………………………………………………………………………….……………-Bank telephone:.................................................................................................................................- Bank fax: …………………………………………………………………………………………………………………………….The principal, hereinafter referred to as "Party" A " And-The Company: The STATE Of ZHOU MARINE ENGINEERING Co., LTD.-Represented by: MR. CHEN YUNG-CHUAN- Passport No.: ……………………………………………………………………………………………………………………….-Office address:............................................................................................-Telephone/desk phone:......................................................................................................................- Email:…………………………………………………………………………………………………………………………………..- Name of bank: ……………………………………………………………………………………………………………………..- Address: ……………………………………………………………………………………………………………………………….- Bank account No.: ………………………………………………………………………………………………………………..- SWIFT: ………………………………………………………………………………………………………………………………….- Bank telephone: …………………………………………………………………………………………………………………..- Bank fax: ………………………………………………………………………………………………………………………………The contractor, hereinafter referred to as Party “B”References:- Letter of Authorization No.: ………………..….. dated ……….………….. of the Council of Ministers,- Sub-decree No.: ………………… dated ……………………………., 2012, on the Investment Approval,- Partnership Agreement No.: …………………………………………………………………………………………….- Record of Inspection of Sand Dredging Machineries is ……………, dated ………………….., 2013Now therefore, the two Parties hereby agree on the following terms and conditions: Article 1: Purpose of this MOU1.1. This Agreement sets forth the memorandum of understanding on the delivery- acceptance of services of sand pumping to the reclamation site and for the construction project in the so-called development site. In this agreement,- Party “A” as the Principal- Party “B” as the contractor to provide the sand dredging and construction services (canal,canal bank, road, bridge, housing residents, factory, drainage system…)1.2. Party “A” agrees to award the contract for provision of services of sand dredging to the reclamation site on …………………(………………………thousand) hectares to conduct the feasibility study of the construction project (canal, edge of the canal, road, bridge, factory and residential buildings…) as well as of the infrastructures existing within the said development project which is geographically located on National Road 1 at kilometer No. 53 in Kandal province’s Kampong Phnom and Preaek Tonloap Communes, Leuk Daek District.1.3. The two Parties mutually agreed on the service fee for sand pumping to the reclamation site at ……………… USD (………………………………...dollars) per cubic meter with a distance to be calculated form the dredging site to the end of the reclamation site boundary; the length of which shall be no more than 13km.1.4. Upon completion of the sand pumping, filling in and leveling of the site to the same level of National Road 1 by Party “B”, Party “B” shall proceed with the feasibility study of the construction project; the duration of which shall be for 20 (Twenty) days. Upon completion of the project feasibility study by Party “B” in collaboration with the agents and qualified engineers named by Party “A”, Party “B” shall present the report of Bill of Quantity (BQQ), samples and technical specifications and engineering materials to Party “A”. And within 9 working days after the submission of the project feasibility study documents to Party “A”, the two Parties shall agree on the date to determine the possibility of study on the construction contractor agreement and the signing of the contract on the following date.Both Parties shall discuss and adopt the plan stating the followings:- The payment guaranty- The phases of payment- The construction and compliance with the standard for such construction- The warranty on construction quality-Technical, material and engineering practice- The compliance with the law on construction and other laws covering the development in this area.1.5. The canal rehabilitation and building of edge of the canal shall be commenced duringthe sand dredging operation for the reclamation site in order to avoid the sand from flowing into the dug canal site (the project of canal rehabilitation and building of edge of the canal, which is attached as Annex 1 to the contract on sand pumping for the reclamation site).1.6. Party “B” shall conduct a field study on the sand mining site and the site to which the dredging machineries are to be transported, inspect the site where the pipeline is to be installed and conduct the evaluation before the report is to be finally submitted to Party “A”.Article 2: Development Project Site, duration of the project study and evaluation2.1. Site: The development project is located on along National Road 1 at Kilometer No. 53, geographically located in Kampong Phnom and Preaek Tonloap Communes, Leuk Daek District, Kandal Province.2.2. Duration of the Study: Party “B” shall complete the project study within a period of 20 (Twenty) days following the confirmation in approval by Party “B” of Party “A”’s source of capital.In case Party “B” reasonably believes it cannot complete the project study within the schedule set above, Party “A” shall be notified in order to negotiate on the delay of the study for any appropriate period and to give time for Party “A” to decide on the extension of the project study as proposed by Party “B”.2.3. Fees for the project study: The service fees shall cover the followings:o The study on the sand pumping site
o The study on the canal rehabilitation project
o The study on edge of the canal building project



o The study on the road construction and establishing gardens along the canal project
o The study on bridge construction project
o The study on drainage-sewage system and waste water treatment plant project

Party “B” shall cover the costs for study on any project chosen by Party “B”.


Article 3: Responsibilities of Party “A”

3.1. To present to Party “B” any legal documents concerning the development project;

3.2. To provide cooperation and coordination for Party “B” during the project study period
covered under this agreement;

3.3. To be liable for due and timely payment according to the schedule set in the sand pumping contract and construction contractor agreement, respectively;

3.4. To furnish the regional map pointing out the development project site and construction plan as specified in the project.

Article 4: Responsibilities of Party “B”

4.1. To conduct study for each project as instructed by Party “A”,

4.2. To study the project and prepare report on the study progress for Party “A”,

4.3. To issue the list of equipments, machineries and staffs to Party “A”,

4.4. To issue confirmation of the financial capacity of contract for sand Party “A”, which is a must, upon the signing of contract for sand pumping to the reclamation site and/ or of the construction contractor agreement,

4.5. To be responsible for ensuring both the quality and safety meets the international standard during the construction.

ARTICLE 5 : The Capital 's Party " A "

5.1. The Capital 's the " A " grade for party " B " shall be checked through the list of account development project of CJCD City Development Co., Ltd. one hour before the signing of Memorandum of Agreement (MOA) for contractors leveling sand pump and construction.


ARTICLE 6 : Capital sources secured for the leveling sand pump and constructions of the “B"

6.1. Capital sources secured for the leveling sand pump:

Party " B " is not elevated amount of items to ensure the leveling sand pump but party " B " to make sure of the possibility and potential of the construct
đang được dịch, vui lòng đợi..
Kết quả (Anh) 2:[Sao chép]
Sao chép!




CAM-JAP SUZUKI Yukio DEVELOPMENT COMMUNITY
DEVELOPMENT CITY CJCD CO., LTD ---- ----  ON Memorandum of Understanding The Delivery - Acceptance of services for leveling sand pump to the building site along National Road 1 at Kilometer No . 53, geographically located in Kampong Phnom and Preaek Tonloap Communes, District Leuk Daek District, Kandal Province, on land area .......... ............... (.............................. Thousand) Hectares and on the construction project Mentioned above trong contract city building site development. No .: ........................ Phnom Penh, January 20th, 2014 This agreement is executed by Between - The Company: Pich Samnang APHIVATH GLASS CO., LTD. - Represented by : Mrs.LY nary - Passport No .: Office address: Telephone / desk phone: Name of bank: Address: Account name: SWIFT: Bank telephone: Bank Fax: principal, hereinafter Referred to as Party "A" And - The Company: MARINE ENGINEERING CO ZHOU BANG., LTD - Represented by: MR.CHEN YUNG CHUAN - Passport No .: Office address: .............................................................................. .............. - Telephone / desk phone: Name of bank: Address: Bank account No .: SWIFT: Bank telephone: Bank Fax: contractor, hereinafter Referred to as Party "B" References: - Letter of Authorization No .: .................. .. ... .. dated .......... ............ .. of the Council of Ministers, - Sub- Decree No .: ..................... dated .................................., 2012, on the Investment Approval, - Partnership Agreement No .: Record of Inspection of Sand Dredging is ............... Machineries, dated ..................... .., 2013 Now therefore, the Parties hereby agree on the two sau Terms and Conditions: Article 1: Purpose of this MOU 1.1. This Agreement sets forth the Memorandum of understanding on the delivery- acceptance of services to the reclamation of sand pumping site and for the construction project in the So-Called Web development. In this agreement, - Party "A" as the Principal - Party "B" as the contractor to the sand dredging and construction cung services (canal, canal bank, road, bridge, housing Residents, factory, drainage system ...) 1.2. Party "A" agrees to award the contract for dredging sand PROVISION of services to the reclamation of the site on ..................... (........................... thousand) hectares to the Feasibility study CONDUCT of the construction project (canal, edge of the canal, road, bridge, factory and residential buildings ...) as well as of the existing Infrastructures development project trong said mà geographically located on National Road 1 at kilometer No. Kampong Kandal province's 53 in Phnom and Preaek Tonloap Communes, District Leuk Daek District. 1.3. The two Parties mutually Agreed on the service fee for pumping sand to the reclamation site at .................. USD (.................................... ... dollars) per cubic meter with a distance to be calculated form the dredging site to the end of the reclamation site boundary; the length of mà shall only be 13km no more coal. 1.4. Upon completion of the sand pumping, filling in and leveling of the site to the same level of National Road 1 by Party "B", Party "B" Shall the Feasibility study PROCEED with construction of the project; the duration of mà shall only be for 20 (Twenty) days. Upon completion of the project Feasibility study by Party "B" in collaboration with the agents and qualified engineers named by Party "A" Party "B" shall only present the report of the Bill of Quantity (BQQ), samples and technical specifications and engineering materials to Party "A". And trong 9 working days after the submission of the project Feasibility study documents to Party "A", the two Parties shall only agree on the date to quyết the Possibility of Study on the construction contractor agreement and the signing of the contract on the date sau. Both Parties shall only adopt the plan Discuss and stating the followings: - The payment Guaranty - The phases of payment - The construction and compliance with the standard for construction vd - The warranty on quality construction -Technical, material and engineering practice - The compliance with the Laws on construction and other law covering the development in this area. 1.5. The canal Rehabilitation and building of the edge of the canal shall only be commenced khi the sand dredging operation for the reclamation site in order to avoid the sand from flowing canal dug Into the site (the project of canal Rehabilitation and building of the edge of the canal, mà is attached as Annex 1 to the contract for the reclamation pumping sand on site). 1.6. Party "B" Shall CONDUCT a field study on the sand mining site and the site to đó dredging are to be transported Machineries, inspect the site where the pipeline is to be installed and the evaluation CONDUCT is before the report is to be finally submitted to Party "A". Article 2: Site Development Project, the duration of the project study and evaluation 2.1. Site: The development project is located on National Road 1 along at Kilometer No. 53, geographically located in Kampong Phnom and Preaek Tonloap Communes, District Leuk Daek District, Kandal Province. 2.2. Duration of the Study: Party "B" shall only complete the project a period of study trong 20 (Twenty) days sau print the confirmation approval by Party "B" of Party "A" 's source of capital. In case Party "B" reasonably Believes it can not complete the project study trong schedule set above, Party "A" shall only be Notified in order to negotiate on the delay of the study for any the appropriate period and to give time for Party "A" to decide on the extension of the project study as proposed by Party "B". 2.3. Fees for the project study: The service fees shall only cover the followings: o The study on the sand pumping site o The study on the canal Rehabilitation project o The study on the edge of the canal building project o The study on the road construction and lập gardens along the canal project o The study on bridge construction project o The study on drainage-sewage system and waste water treatment plant project Party "B" shall only cover the Costs for study on any project Chosen by Party "B". Article 3: Responsibilities of Party "A" 3.1. To present to Party "B" any legal documents Concerning the development project; 3.2. Cooperation and Coordination for cung to Party "B" project khi the study period covered under this agreement; 3.3. To be liable for vì and Timely payment theo schedule set in the sand pumping and construction contractor contract agreement, respectively; 3.4. To furnish the regional map pointing out the development projects and construction sites in the project plan as rõ. Article 4: Responsibilities of Party "B" 4.1. To study for each project CONDUCT as instructed by Party "A", 4.2. To study the project and prepare the report on the study progress for Party "A", 4.3. To issue the list of equipments, Machineries and staffs to Party "A", 4.4. To issue confirmation of the Financial capacity of contract for sand Party "A", mà is a must, upon the signing of contract for sand pumping to the reclamation site and / or of the construction contractor agreement, 4.5. To be responsible for the quality and safety Ensuring both Show meets the international standard khi the construction. ARTICLE 5: The Capital 's Party "A" 5.1. The Capital 's the "A" grade for the party "B" shall only be checked through the list of account development project of CJCD City Development Co., Ltd. One hour is before the signing of Memorandum of Agreement (MOA) for leveling sand pump and construction Contractors. ARTICLE 6: Capital sources secured for the leveling sand pump and constructions of the "B" 6.1. Capital sources secured for the leveling sand pump: Party "B" is not elevated amount of items to Ensure the leveling sand pump but party "B" to make sure of the Possibility and Potential of the construct



























































































































































đang được dịch, vui lòng đợi..
 
Các ngôn ngữ khác
Hỗ trợ công cụ dịch thuật: Albania, Amharic, Anh, Armenia, Azerbaijan, Ba Lan, Ba Tư, Bantu, Basque, Belarus, Bengal, Bosnia, Bulgaria, Bồ Đào Nha, Catalan, Cebuano, Chichewa, Corsi, Creole (Haiti), Croatia, Do Thái, Estonia, Filipino, Frisia, Gael Scotland, Galicia, George, Gujarat, Hausa, Hawaii, Hindi, Hmong, Hungary, Hy Lạp, Hà Lan, Hà Lan (Nam Phi), Hàn, Iceland, Igbo, Ireland, Java, Kannada, Kazakh, Khmer, Kinyarwanda, Klingon, Kurd, Kyrgyz, Latinh, Latvia, Litva, Luxembourg, Lào, Macedonia, Malagasy, Malayalam, Malta, Maori, Marathi, Myanmar, Mã Lai, Mông Cổ, Na Uy, Nepal, Nga, Nhật, Odia (Oriya), Pashto, Pháp, Phát hiện ngôn ngữ, Phần Lan, Punjab, Quốc tế ngữ, Rumani, Samoa, Serbia, Sesotho, Shona, Sindhi, Sinhala, Slovak, Slovenia, Somali, Sunda, Swahili, Séc, Tajik, Tamil, Tatar, Telugu, Thái, Thổ Nhĩ Kỳ, Thụy Điển, Tiếng Indonesia, Tiếng Ý, Trung, Trung (Phồn thể), Turkmen, Tây Ban Nha, Ukraina, Urdu, Uyghur, Uzbek, Việt, Xứ Wales, Yiddish, Yoruba, Zulu, Đan Mạch, Đức, Ả Rập, dịch ngôn ngữ.

Copyright ©2024 I Love Translation. All reserved.

E-mail: