-Before the baits, paint needs to complete the following task:-Construction is completed the waterproofing layer (if any).-Installation of pipe system engineering (plumbing, electrical lines, pipe, buried underground).-Do not make baits work, paint surface structure when the humidity exceeds the humidity allows. Humidity allows for wooden constructions with oil paint is 12%. Humidity allows for structural concrete, plaster, brick wall when using paint is 8%.The material must be packed, painted baits carefully left the manufacturer's marks, when the packaging damaged or lost production marks have the doubt of the quality needed to check the quality before using it for the work.-Construction mastic layer reaches the technical requirements, no dust, no cracked foot, smooth flat surface.-Check and repair the defect on the surface of the paint. Structure surface before painting should be clean of dust. The surface roughness, the defective seat need fillings matic for guest before sanding smooth.-The paint is scanned as many layers: lining, coating. New class after class of dry before scanning. To preserve the well when the paint dried yet.- Chọn hướng lăn sơn sao cho lớp cuối cùng phải theo đường thẳng đứng đối với tường, hướng ánh sáng từ cửa vào đối với trần, theo chiều thớ gỗ đối với mặt gỗ.- Công tác bả, sơn phải thực hiện theo từng lớp theo chủng loại và độ dày theo thiết kế, chỉ được thực hiện lớp sơn kế tiếp sau khi có sự đồng ý của giám sát kỹ thuật công trình.- Bề mặt sơn bả mastic: phẳng, nhẵn, bóng, không rỗ, không bong rộp bề dày lớp bả không quá 3mm, bề mặt mastic phải đều màu. Bề mặt sơn phải cùng màu, mịn, bóng và không lộ lớp sơn lót bên trong.
đang được dịch, vui lòng đợi..