- Proposal to replace fire protection equipment for phase 1 - Proposal to sign insurance contract - Proposal to replace T-pipe on the 24th floor - Proposal to fix pool light problems, periodically replace sand, materials to replace filter pump swimming pool - Proposal to replace damaged components of the 2nd air conditioner in the lobby - Proposal to replace the power board of treadmill number 1 in the gym - Proposal to cut, weld and replace fire protection water pipes 24th floor - Proposal to extend Thien Hy Long contract - Proposal to consider contractor Astec's request for price reduction - Proposal to sign elevator contract with Kone - Proposal for Halloween plan.
đang được dịch, vui lòng đợi..