INSTRUCTIONS FABRICATION AND TESTING
FRAME REBAR I / General Rules: All materials must not be rusty - Area cross section must be consistent and not have any disability. - After production, the material should not have the wrong way. Except for the curve, the line cut perpendicular to the axis of the steel bar. --The Air must be cut with a straight fit cut mold - cutting and bending the heat used to be conducted under proper temperature. The material must be cooled by measures will not affect the physical properties and chemical properties of the materials. II / Guiding fabrication, inspection reinforced frame: APPLICATION REQUIREMENTS 1.THAO WORK AND INSTALLING REBAR: Everywhere, all reinforcement must be protected to avoid mechanical damage or damage to the surface, rust or other causes from time ratings wait until fitted put. Reinforced stored at the site must be left on the floor or a wooden frame with a reasonable distance so as not to have any reinforcement located above or in contact with the ground. When the weather is dry and storage time prior to installation restrictions, may not be stored in the house, but if there is rain or other wet weather occurs or predictable, the bars must be kept under the sheets cover. 2. QUALITY OF REBAR AND SUPPLY - The representative sample of all rebar used in the plant must be submitted before work starts to Engineering consent in writing, together with the certificate of Manufacturer clearly announced production site, date and size of shipments to factory, and all the details related to the composition, manufacturing process, intensity and other quality indicators of steel . -In the case at any point reinforced when laboratory sample does not meet the requirements of technical standards, or technique that samples were sent for laboratory technique is not really representative sample is, or if visible is reinforced not approved to be used for production, the Engineer may instruct beat out all the construction work volume that uses reinforced that. - All applicants rebar testing must meet the requirements and the limits prescribed by the ASTM / AASHTO of sizes, types and separate any additional requests otherwise. 3. LIST AND MAP OF BENDING THANH Technical Department must provide detailed checklists and rebar bending diagrams for Engineering for review. The process will not be started until the list above be approved. 4. OUTSOURCING: CET thDp vssng - IMPACT thDp Meters for Tet Here both CC Dion vssng tYch poetry Bei ®ic s¾p ®Aet two very shocked and Chiou dCy Phil Eng VII th © n nhá 180 mm or three Phil h¬n VII Chiou dCy th © n 180 mm or greater than the. CCH gi ÷ ACC Kho¶ng Phil ph¶i kh «ng Chiou dCy meters greater than the DAC Ceng 6 mm bar. Here both CC Phil ®ic Tet Si ce VII luat it follows several meters then in order t¹o thDp frame. CCU yªu cc for cc of technical thuEt vssng KHC, Mei hμn, out- side air in Vth TRY Eng ®Aet CET, etc ... Si ®ic P thunderstorm for PHP t¹o ph¬ng nμy thDp CET. - When CET thDp vssng ®ic majority, Vth ®Aet TRY TO CNA Na Si in the range 35-50% butter dCy n th © ENG calculated from sight in the out- side air, back when Bo dCy 63 th © n nhá h¬n mm, Chiou ®μy Philippines are conserved wife bª CNA t «ng ®ei VII VII ®ei CET Eng DAC according Si n th © lμ 19 mm t¹i Here both two VTH TRY n» m Horizontal Vertical th¼ng vμ. - vii ENG Both IMPACT CET thDp vssng, Vth TRY CNA ®Aet so quickly ph¶i ®ic MCI SI IMPACT Phil ngoμi wife are conserved bª CNA t «ng <br> THE ngoμi CET © n th DAC according Eng lμ 25 mm. - VII Eng CET thDp very shocked and butter dCy d¹ng VII th elliptical 63mm or greater than the © n, th × CET thDp ph¶i TRY friend Phil are conserved so ngoμi CET wife DAC out- side air under th © n Eng lμ 25 mm Ko CNA from the surface in Vth TRY Eng t¹i IMPACT kYnh vμ 25 mm Vertical th¼ng Ko from the surface ngoμi Vth CNA TRY Eng t¹i IMPACT kYnh n »m horizontal. In thDp d¹ng CET very shocked and elliptical Eng Ministry dCy VII th © th 63mm × n nhá h¬n bª Philippines are conserved wife t «si ng lμ 19 mm ë Here both two ph¬ng IMPACT kYnh Vertical th¼ng vμ n» m horizontal. - Sai Loch Vth TRY l¾p ph¶i Si tu ®Aet CET thDp © n thn under CC provided Loch luat wrong casing to form that will allow phDp evaluated if thic. - CCH Kho¶ng ACCT © m gi ÷ CET thDp vssng kh «Since the process 100 mm screw ng ®ic Eng bonnet for th © n to the critical dCy 100 mm, kho¶ng CCH nμy kh« Since the process screw ng n ®ei Chiou dCy VII th © nh ng Ceng ÷ Lin v, and kh «How giê ng Since the process 150 mm screw ®ic CET -When th DAC thDp © n Eng kh «ng Nei KDO dμi ®On area, Chiou dμi wore to the first DAC CNA Tei diagram u c © CHN lμ CET 75 mm, back when kho¶ng CCH Since the process nμy duck Noa meters Chiou dCy th © n eng, eng Si n th © stuffed meter YT Choa tYch CET thDp Dion Dion tYch increased Ceng CNA provided luat Tei thiOu VII MCI MDT dμi Eng. Chiou dμi thiOu ®ei VII to the first TEI CET Mac DAC uen c © u si lμ 13 mm. -e diOm uen c © u to the first MAC CET th DAC lμ × 13 mm Si Phil <br> THE NOU very shocked and Mac uen c © u vμ 6 Nou mm kh «very shocked and uen ng. - Try vμ Calculate Vth liªn Cooling CNA thDp vssng CET kh «ng ®ic organic pH during the examination c« ng Eng, back when both the CNA plays an khch hμng, for phDp Mac t¹o u c © CC LC ë or crocheted Eng VII ®Ych the motion is integrity. - NEI such if CC derive a kh «ng ®ic hμn, SI ®ic CET thDp weather, b» © ng c d y thDp ®o¹n Chiou dμi very shocked and kh «ng nhá h¬n 20 times has ®ei VII IMPACT kYnh thDp v» n vμ VII cc CET thDp bar t¹i altitude where persons living poetry contest uen c «ng, 40 times has IMPACT kYnh ®ei VII CET thDp tr¬n vμ thDp persons living KDO. The development VII CET frame thDp hμn weather, CC, SI ®ic th × derive a friend TRY weather, according to Chiou DAC CHN CET. - When CC derive a lμ Nei derive a vμ hμn kh «ng ®ic yªu weather, according CCU CC Tei thiOu detouring the above, ph¶i lμm mailing the parcels CET thDp The solution KDO MEU meters hμn trªn vμ YT letters stuffed to the critical 50% Ceng ph¶i ®¹t temperature Tei CNA thiOu thDp vomiting vμ the parcels currently doing hμn Tei thiOu lμ 50 mm. VII cc derive a GIP hμn Mei, for some lines for CC ®ic phDp vssng xo¾n EC, Thy The solution KDO SI ph¶i ®¹t CC CET CHN stuffed YT 75% to the critical temperature Tei Ceng thiOu provided luat for thDp * thDp DAC CET CET -mci IMPACT thDp vssng ®ic ghDp transformations are thμnh t¹o CEU CC characterizes the parcels, then in order to maintain × CET thDp ®ic d¹ng vμ Approximations Approximations TRY Vth. When ghDp CET DAC, Cc Cc to the first MEU ë CET derive a DAC, or MEU CC cccch ng qu • vssng ®ai trªn after ®ae bª t «si ng kh« ng ®ing lssi out ngoμi. - to the first thDp CET Chiou Nei Nei dμi CNA CET thDp area ®ic line number robes ® © ë ie if lμ Chiou dμi out- side air in to the first CNA uen Chiou dμi out- side air or Mac ngoμi CNA ®o¹n ko u c © Enlarge CNA cuei xueng shoulder the parcels Eng. FINAL cuei CC CCH kho¶ng or ë <br> THE IMPACT trssn cuei Phil Si P Cu trªn BET ®iOm thunderstorm VII IMPACT trssn CET CNA or NEI Eng. When CET thDp xo¾n ®ic number CC CCH vμ kho¶ng nμy si Dion tYch CET thDp ®uoc calculated from the above ®iOm CC xo¾n are nearly stuffed to the critical IMPACT IMPACT Eng cuei CNA, back when C c ®iOu ®ic KHC khch hμng for phDp, then ® © CC yªu CCU y p evaluated if CET Nei ph¶i thunderstorm: - to the first thDp CET Nei Nei Eng ®iOm very shocked and VII CC ® kh dominated buffer zone «ng b» ng rubber - VII nh ng Eng ÷ 900 mm very shocked and IMPACT kYnh or greater than the, to the first uen vu «ng to the first or Mac uen c u si ®ic Meteorology Book © CC vssng thDp . SI ®ic they CET thDp nμy t¹o out the parcels KDO speedometer dμi thDp village chÝnh CNA, or ®ic t¹o out b »thDp the specific lang ng meters Biot VII thiOt Dion b» ng m «t Noa VII thiOt ® Dion exact differential thDp simply do thnh village, YT lμ h¬n. - CET thDp yªu such if uen vu to the first CCU «ng or Mac uen c © u, th × Bo ë dCy Phil ®¹i to the first pole <br> THE SI lμ meters thDp CET noa nei Chiou dμi or 75 mm. - VII cc ®iOm CET Nei Nei thDp ®Om lμ Jong very shocked and rubber - very shocked and VII IMPACT Eng nh ng ÷ 300 mm or greater than the kYnh, th × they CET thDp trssn SI. They CET thDp nμy SI G vμo ®ic ®ai ngoμi vssng meters, or simply do ®ec vssng, thêng h¬n YT, or both coarse lμ vssng meters Biot ®ai TCH it shoved another CCH lμ 01 MDT DAC yªu nh th © CCU ë n Eng. TCH vssng meters Biot ®ai such if ®ic majority, th × YT vssng ®ai ph¶i KDO dμi stuffed 25 mm Since the process according yªu Chiou dμi perimeter CNA wanted CCU then in order uen vu to the first CC «ng NEI ch¾c breathe ch¾n VII g ë the parcels to the first firing Eng. * BENDING: Bar reinforcement must be cut and bend in the shape shown in the drawing. All the bars have been bending cold, unless allowed to do other * HOOK AND BENDING SIZE: The size of the hook and bending diameter is measured at the bar inside the right as shown on drawing. * BENDER AND NEO -Each rebar cutting and bending to the dimensions specified in the drawing -For the bending rebar, in each case to follow the manufacturer's recommendations. All the bars have been bending cold. All the bars need to be bending bending matching process American Concrete Institute's details unless stated otherwise. Must use qualified workers to cut and bend, and must provide the appropriate equipment for this job. 5. FIXED REBAR reinforcement must be installed on the shape and size as shown in the drawing. -The Bar sections have already been pointed out and must be fixed tightly and accurately in the formwork at the location shown in the drawing. The bar must be forced, welded together on site to make sure the intersection to ensure reinforced frame, as a block, to keep its shape, and the frame should be temporary supports to keep its exact location in Dress formwork and concrete pouring. Head of the steel fibers have to go inside and not allowed to protrude outside the concrete surface. - At the time of concreting, all reinforcement must be cleaned thoroughly and no rust, mud, oil or any coating that can destroy or reduce the tack. - Techniques to inspect the set of bars and no cases in which rebar is put into molds which have not been approved by the Engineer Art. Not to put any bars inside or remove the reinforcement bar from finishing without technique allows. 6. Everywhere rebar reinforcement All must be provided adequate
đang được dịch, vui lòng đợi..