Track lu must overlap at least 20 cm. The weekly first lu Sockets along, then proceed to lu from outer edge parallel to the road and heart towards the heart of the road. When lu in the curve has a super disposition the lu will proceed from the low side of the room towards the high side. The weekly lu not to stop at points within 1 meter from the end point of the previous turn.8.7.7 during lu, lu for iron to moisten the iron wheels regularly with water. For lu, used gear oil stick sticking fairness few tires weekly beginning, when tires have had approximately the temperature with the temperature of the asphalt concrete mixture will not happen bad stick sticking anymore. Not beuse water to moisten the cake slightly. tires Do not use oil or condensate, diezel oil solvent hasthe ability to dissolve the asphalt to obliterate into gear lu.8.7.8 When lu launch, redirected back ... to manipulate gently, do not change abruptly to asphalt mixture from being moved and RIP torn.8.7.9 roller and the heavy equipment cannot be parked back on plastic concrete layer has not been tight lèn luand yet cool.
đang được dịch, vui lòng đợi..