In the entire process of implementing maximum load test must comply with strict safety procedures the transport unloading every super market. Check the technical condition of all the facilities, materials and tools involved to try downloading. Personnel involved must have adequate labor protection and strict compliance with the safety regulations in the workplace. Note: wear white glass and seatbelts work on high when working at the location requested. The direction taken to disseminate the content of work to everyone involved, analyze and assess the threat may occur in the process of work for people to grasp and have suitable precautions. Crane working areas must be strung wire warning, only those who join the new installation work was going on inside.
đang được dịch, vui lòng đợi..
