The cheat the mass pillaging the topsoil layer in white as well as in the entire path of package A3 on 300,000 m3, JTEG own. A3 (Jiangsu company) paid to 30/6/2016 topsoil layer peeling 150,000 m3, the wantonly Hill km 103:53,000 m3như such payment control on 200,000 m3đất peeling pour away, but in the waste dumps allows no then that volume where that payment?
đang được dịch, vui lòng đợi..