When reality check the scene for the online segment Km111 + 100-+ 800 Km111 found that:-Have appeared more groundwater runoff on the mold surface and taluy road.-The rock face in this paragraph to see the water after some time being disarticulated, alter the physical properties of the rocks on the bottom line than the coat texture profile design has been approved.Thus, after thorough research the relevant documents, the contractor proposed recommendations of underground water and water from the roof slopes down pour sugar coat texture range reassigned by structural foundations of the road at the location of Km111 + 180 ~ Km111 + 780; Km112 + 155 ~ Km112 + 780, specifically as follows: