- Make sure there is one way of moving airy and firm to the delivery truck and crane bucket can operate. Must determine the capacity of each truck and truck crane is suitable.
- Survey prevailing wind direction, thereby setting a floor plan and rallying roofing installation instructions.
- Decision of loading and maintenance plans Managing supplies. Need to pick one strong position, dry lamnoi gathering supplies. Supplies should be stored in areas designated for each block, and clearly marked the location of each category in the bowl containing the (warehouse). Need to ensure that the supply schedule and preserve supplies to appropriate, nor deviation from the installation progress and considering the progress of the other subcontractors.
- Conducting registration of positions connecting electricity / water construction on the site. Should ensure a safe way to carry these supplies led to the work area.
- Check the insurance organization and the Health and Safety training for workers.
- Inspection of construction equipment, all equipment , equipment, and machinery to ensure that all equipment meets normal working requirements.