Currently, contractors are preparing to work cast reinforced concrete piles for items flood walls and basement walls of CW3A Package - Project Development Urban Transportation Haiphong. According to the design of reinforced concrete piles cast Available all four corners beveled 2x2 cm, the purpose of the taper angle to avoid chipping edges pile during shipping and handling. However, the creation of the bezel above the angle of the pile will spend a lot of time building and not take advantage of the formwork equipment available on the market. Also, due to the work site of the new retaining wall items are handed over to the date of 03.03.2015, to accelerate the construction and utilize resources formwork equipment available on the market, contractors threads not produce beveled corners of reinforced concrete piles of two types of spindles and 45 x 45cm square 40x40cm. If any broken corner stakes, the contractor committed removed from the site immediately. We suggest the Bed Board and Consultant closely reviewed, approved, making it very easy for contractors to accelerate construction, offset by the present time by the construction handover delay. Sincerely ./.
đang được dịch, vui lòng đợi..