Application methods of the waterproofing bathrooms, will explode, roofs;
- Set rainwater drainage pipes for the roof design. Vents around the base adjacent to the base portion to be inserted floor thoroughly dedicated waterproof mortar.
- The mouth of a drain water collected at the end of the afternoon set of Seno steep water. The mouth of a drain water collected at the same time put the concreting Seno.
- Put trash screens on the mouth of a drain collection. Drainpipe legs should be handled to easily get garbage out of the tube when necessary.
- It should periodically check the hygiene conditions on the roof.
- Soak cement 8kg / m3, 7 day, 2 hours stirring 1 time required for waterproofing concrete floors.
- Lang mortar accordance thickness, slope and grade grout, waterproofing correct process design requirements.
- Lang by tension to mount the first and second mold some point, experienced true thickness mortar requirements. Use a wooden massage table and massage pat them flat. Maintenance of moisture within 7 days.
- All the neighboring layers and sweep up the floor special waterproof water zones are lifted off the wall> 30 cm to prevent water seepage through walls.
- To ensure good waterproofing requirements, the concrete structures must be designed properly graded, compacted, well maintained.