-Support for technical issues PPMU.-Set up the reports required by the contract.-Review surveys, hydrological, water-quality analysis result raw.-Considering the hydraulic design of water supply system, including the high hydraulic from raw water collected works, pump stations, higher crude process of the public until the transport pipeline network, distributing clean water, connect to the household.-Review design technology, the drawing of the constructions and water supply networks including household connections. -Review design technology, the drawings of construction works for public toilets, toilet households. -Support team leader determines the form and frequency of field inspection, testing of materials, devices will be used or installed at the scene prior to installation.-Support team leader review and recommend approval/disapproval of the contractor's proposal about the measurement system, the measures for measuring and calculating the volume of work done.-Regular supervision, perform daily monitoring the activities of the contractor to ensure the quality of work, vocational competence of the personnel of the contractor and the compliance with the terms of the contract; Records confirm the volume of work carried out and the necessary recommendations to the contractor's work diary.-Support team leader considers the system of certification of individual pieces of work, the process of releasing partial completion certification and implementation of measuring method and verify the volume of work done.-Support the group to consider the proposals of contractor in terms of volume, the extended period of construction or other problems.-In case of change of the approved work items, support team leader prepared the documents necessary for the negotiations between the Project Management Committee (PPMU), the owner and the contractor.-Maintain records, photographs of all stages of works, other documents related to the events and regular activities; Organization and storage of the minutes of the meetings on the scene regularly between the parties to the contract.-Support team leader considers the drawing Huan, documents attest the quality of supplies, equipment, pipe, the document issued by the contractor to submit.-Support team leader considers approval/disapproval guidelines on operation and maintenance works were completed and the equipment.-Support team make the final inspection of works, and recommended the issue when establishing a certificate completion.-Providing specialized services when needed and when requested.
đang được dịch, vui lòng đợi..