To build and put into operation the plant should be built and perfected the basic work items as follows:
+ The wind turbines (complete set).
+ 22kV grid links turbine clusters.
+ 01 improve voltage substations 22 / 110kV
+ 110 kV line connecting to the national electricity system
operator + (management) and yard yard equipment, turbine foundation construction.