Martech Boiler Co., Ltd.LEVELS of MICROWAVE OVEN SOÂI-25 ATTACKS page 1/31PRINCIPLE V Õ T COAL, RICE HUSK, GROUNDCHOCOLATE INTRODUCTION SUMMARYABOUT MICROWAVE OVEN ÑOÁT FOUL YOUR PERIP COAL G DARK CHOCOLATE Coal burning smell microwave oven, boiling floor mill husks symbols MFB-20-12 type smell microwave oven hoses, fire tube type abalong, drilling away in the camera, the water in the external camera. The section contains foul by one recipient, but also to ensure balongcomplete contains water. Buoàng ñoát be beùc cash position to which the first spray a microwave oven. Fuel (coal, rice husk, ground)pheãu contains data on the diversion load buoàng screw, ñoát, burned in the fire Chamber and on the Berlin of the boiler to generateenergy, and Toyota, auto ngoïn water in the combustion chamber temperature xaï böùc transmission for the next böùc heat-dualxaï, then go to the dual camera for your store then over heat, auto, balong go through heat saving devices and then gothrough the chimney technologies microwave oven. A microwave oven is foul calculation heat insulation wrap a reasonable way to reduce lossesheat and improve the performance of the boiler. A microwave oven is the Board the beef page van clock, pressured, camerathuûy, safety valves, fuel ñoát system and automatic water level. Operating equipment articlemodern boiler control may allow the boiler works in fully automatic mode, auto salesor by hand. Martech Boiler Co., Ltd.LEVELS of MICROWAVE OVEN SOÂI-25 ATTACKS page 2/31SPECIFICATIONS OF STINKING MICROWAVE OVENThe numberTTThe properties method unit computer MFB-25.321 Feature receiver born in the stinking D Kg/h 25,0002 Apply the maximum working power PLV BAR 293 baõo thbh hoaø sweat temperature 0 C 2314 temperature water level tnc 0 C 1055 fuel use-coal-Inđô6 performance microwave oven 83 to 87% foul7 Maximize the wear and fuelCoal-thank youB-------------Kg/foul attacks------------- ………….. HEY V ACCESSORIES -Characteristics of fuel boiler to provide the right design requirements-The size of fuel must be evenly and properly designed size-Fuel not confused too many impurities affect the combustion of fuel-The amount of fuel must meet at least one ca operations  MADE V -Operating personnel must have the certificate of boiler operating-Operating personnel must undergo a training course 1 boiler operation-Operating personnel must be aware of all the characteristics, properties of boiler equipment-Each ca operates at least 2 people maximum hànhMartech Boiler Co., Ltd.LEVELS of MICROWAVE OVEN SOÂI-25 ATTACKS page 3/31 the section of the GENERAL GUIDELINES of the PROCESS VONIONS, TUNA G OVEN AND TOLD DƯỠ G H I FURNACEI. CAN INVESTIGATE Õ V G Ò T SYSTEM:Before operating the boiler, the boiler or the first stoppage on May 1, hours of operationback then the need to check the following parts:1. The types of water supply pipe valve, steam, complete installation and must be properly attributedPham. The valves must ensure the sealed and close open d.2. The fuel supply system must be installed properly, ensure the capacity andthe activity must synchronize according to design requirements.3. Check the system fan, pump systems and piping system must be installed properly technical requirementsart and power requirements, the operation of normal equipment parts.4. check the mechanical structure of the boiler (floor sand structure, data supply system, feed screw) mustinstallation and operation standard requirements.5. check the measurement device, automatically are correctly designed and installed correctlytechnical requirements. See the measurement parameters shown is appropriate and accurate.6. Check the hydraulic hoses are of standard design and convenient to observe the water level in the ovendo not. Check the highest and lowest water level of glass tubes, two water level must be equal to the levelthe average water ± 50 mm. Turn water supply system for the boiler to the Auto mode, proceed to dischargethe bottom of the boiler system, observe the water level descending on the glass tube, when the water level drops to the levelinstallation, System feed water pump on the boiler is in operation, close the drain valve, water level observationsascending to the highest line of glass pipes, water pump stops operating, the water supply system for thenew boiler guarantees required.7. check the safety valve must be installed in accordance with the design requirements and value settings of the valve mustAccording to the required design pressure:+ 1 safety valve installation: 31.2 Bar+ 2 safety valve installation: 31.4 Bar+ 2 safety valve installation: 31.6 Bar8. Conducting overall surveillance boiler, when Ridin make sure the boiler equipment DD is mountedplaced and properly installed according to the technical requirements for conducting the operation. And when operators must havea new stand in total breaker (CP total) to cut sources of timely when the incident occurred. Martech Boiler Co., Ltd.LEVELS of MICROWAVE OVEN SOÂI-25 ATTACKS page 4/31II. MAINTENANCE Õ DRYING TOO: After checking all the devices of the boiler unsatisfactory, we proceed to drying processcleaning the boiler, and for drying brick, v a, insulation of the oven. In particular to stabilize the back glass networkmetal-containe's deformed after work-built fireplace. transport nurses are too drying oven gloved! p t go pass regularly checked t eo watched allt iết been
đang được dịch, vui lòng đợi..
