B-PRODUCTION DEPLOYMENT.2.3 Cover fabric.2.4 the cut fabric.2.5 Distribution, given file peeling produce.C-STAGE GARMENTS.2.7 workshop.2.8 quality control at the workshop.D-IRONING, PACKING.2.9.2.10 the packing of the product.Chapter 3: conclusion.3.1 Summary of the process of implementing a code.3.2 occupational safety at the workshop.3.3 commented on the situation at the company.
đang được dịch, vui lòng đợi..