Concrete is compacted so that by the high point had been controlled, concrete surfaces are created with high level design Supervision consultant approved test; Positions available in 5m 1 share stake. All points on the Supervision consultant will check and acceptance.
- Bottom grooved concrete is poured continuously for the remainder of the construction segment.
đang được dịch, vui lòng đợi..
