Article 6: Responsibilities and rights of the parties.
1. Responsibilities and rights of Party A:
- Receive and wastewater treatment to Party B as stipulated in Article 4
- Ensuring the maintenance of sewage disposal services as prescribed.
- Responsible for the quality legal wastewater after further processing and release to the environment.
- There are not receiving wastewater rights of Party B in case:
+ wastewater too dirty, over the provisions of Article 4.
+ Failing to comply with the terms of the contract.
2. Responsibilities and rights of Party B:
- Party B must coordinate with Party A in wastewater connections. The connection must ensure convenience for test, control, take samples for testing.
- Party B must build technical manholes before connecting location of the wastewater collection system before connecting Party A (the technical manholes located inside a fence factory nearly 0.5 - 1 meter).
- to collect all wastewater and comply with Article 4 before it enters the wastewater collection system by party A.
- absolutely not to direct rainwater into the sewage collection system of Party B and put into the drainage system of the Party A.
- Payments to Party A in accordance with regulations.
- to appoint officials with Party A sampling investigation and the control sample sealed up, bear the cost of testing the control samples as prescribed in Article 4.
- strictly routine water quality monitoring of treated waste internally as written commitment to protect environment (or EIA) and vote results posted to Party A (the photo).
- In the case of the system of internal wastewater treatment of Party B is incident can lead to reduced quality of wastewater treatment, party B a written notice to party A known to be active in the next processing stages of party A, at the same time as the calculation managed review of charges dealt with accordingly. Party B is responsible for testing and notify Party A after troubleshooting to confirm the quality of treated wastewater. Wastewater volumes incur higher handling costs are calculated from the time of discovery to the time fixed the record is determined by the two parties. In an internal process, if Party B that the effluent quality was better than previously tested (by those slips of Party A), it may request Party A to the sampling inspection to the distribution more practical waste water types.
Article 7: Miscellaneous.
1. Any change or adjust the content of this contract must be confirmed in writing by the official representative sides are unenforceable.
2. Both parties are committed to comply with the terms signed, during the performance of contracts, if any problems arise discussed together the two sides settled on the basis of respect for each other's interests. In case of failure to resolve the case record will be filed at the People's Court Huong Thuy town, Thua Thien Hue province. The ruling of the court is final and force the parties to comply. All costs test, verify and court fees by the party at fault resistant.
3. In the course of contract performance, if there are changes of state or Thua Thien Hue Provincial People's Committee relating to the rights and responsibilities of each party or the contractual relationship to be legal, the two parties will adjust signed annexes to contracts made and are inseparable parts of this contract.
this contract is made in 04 copies in Vietnamese, each hold 02 copies have the same legal value.