In the above reference, Daelim industrial requirements 17 accelerate bridge design and construction drawings completed in late October 2015. However, as he was known to the Britec design unit please pull out of the project, the bridge has 17 factory efforts find new design unit and contracted to catch up the progress, costs twice new design compared to the cost of the original design. 17 bridge enterprises will try to meet the design progress at the request of the Daelim is late October 2015, however some own category of difficult and entangled the premises as the Beltway overpass 2, bridge across the River, the elite would be pushed back end design in December 2015. (see the detailed progress of construction drawing design submissions).Progress of design launched on the basis of not arisen interface with other packages and the errors of design techniques that fact and Daelim industrial demand 17 also does not resolve. So the schedule can be adjusted according to the unity of the party.Daelim main contractor wishes to review and approve progress of construction drawing design.
đang được dịch, vui lòng đợi..