- Preparation of materials and equipment. MLD crane and vacuum + the St. 20.0002 and equipment from the company moved into the Quang Ninh Cement CT CT Cement + down to consumers and device in a convenient location for construction
- Connect the power supply for MLD and MHCK fighting hoses.
- Suction 16,000 (l) MBA oil in a tank full of oil, while preserving nitrogen load MBA.
đang được dịch, vui lòng đợi..