-Construction of the auxiliary fence, internal roads, road and drainage, electrical lines, trees ...-Transport and installation of the equipment: the equipment transport with a mass of about 12,000 kg to the location of the Tower shortly after construction.-Station operation: operational measurements of radar equipment, ten fish the Wen At the time of observation, the project has completed the phase of leveling, are conducting the construction of the tower.
đang được dịch, vui lòng đợi..