The buildings of 5 storeys or down, take water directly from the mains water supply services by the pressure of the water supply system of the area.
The high-rise buildings (≥5 floors) are issued from the distribution pipeline lung. At each work must be arranged tanks and booster pumps locally (Position pumping stations and reservoirs will be determined at the project planning stage of the construction).
đang được dịch, vui lòng đợi..
