Appendix contractual
After discussion, the two sides come to an agreement:
Based on the billing period in Article 7, the contract dated 12.03.2015 No. 2015-15-06
Based on the actual situation:
in the process installation, commissioning, the machine detects a GUNDR detailed technical malfunctioning machine.
Leading up to the machine can not be put into operation as originally envisaged.