10.3 the sequence of construction paint:Step 1: cleaning and surface preparation-With the new wall surface, must spend enough time to dry completely and a full time maintenance (from 21-28 days). Wall moisture to below 16% (according to the ProtiMeter moisture meter).-Use the grinding, sharpening the wall to remove the impurities affect the adhesion of the layers of dough baits or paint. Besides, the grinding wall created relative flatness for the surface of the wall.-Then use sandpaper rough back surface and then dirt hygiene by air compressors or cheap clean water repellent.-Before proceeding with the baits matít, if the wall is too dry, so moisten the wall using Rulo rolled through the wall with clean water. (Note: just roll a thin water should not roll too much water).Step 2: Baits pastes* Baits class 1:-Use one of the types of dough baits (was mixing and bagging, carton in powder form). Mix 1 part powder 2.5 with water by volume. Stir to mix them until the powder components link together into a paste.-Desktop baits, baits class 1 on the wall then leave to dry for 2 hours and use sandpaper type just flatten the surface. Use clean or chestnut air compressor clean the dust powder to conduct baits (execute baits after mixing with water within 1-2 h)* Baits class 2: -Mix the powder with water as in the first grade, after 24 hours of sanding to smooth, flat surface. (do not use sandpaper rough scratch the surface smooth of matít).-Using lights to check the flatness of the wall already.-Baits this page twice on protrusions then proceed to wall surface hygiene have baits.-Use of clean or chestnut air compressor to clean the chalk dust particles.-To dry the surface of the wall have baits after 24 hours and proceed to paint the coating step. Step 3: primed-Use regular spray paint or Rulo a priming and waterproofing sealer for the outer wall of the House and to the wall in the House.-Paint a wet paint layer with a thickness of 100 standard microphone.-Can add up to 10% mixed solvent by volume niche in the construction process.-Paint grade way after 1 to 2 hours (by temperature)-Clean the construction tools with appropriate solvents. Step 4: paint finishingUse a spray or paint usually Rulo two layers (2 class minimum) paint-lined protection options:1. Paint protection, outdoor decor: outdoor paints.2. Paint protection, decoration in the home: The types of paint in the House.-Can add up to 10% mixed solvent (clean water) by volume in the process of construction.-The following layer separated from 2-3 hours.-Clean the construction tools with appropriate solvents.-Wall painting by paint used to paint rollers, paint from the top down. Face paint colors are guaranteed. Paints and paint color select investor approval.-When the leading paint adjacent 2 colors are there white tape affixed to the finished grade duct tape edges are straight. The purpose of making the 2 clear color boundaries increase the beauty of your works. -Painted surfaces is guaranteed, no stain, no condensation flows, Bhikkhu stain marred or color.
đang được dịch, vui lòng đợi..