After inspecting the work site at the power lines crossing locations, to construction work is not affected, we have contractors is as follows:
1. Location abutment A2 Rach Lap Vo:
- In this position, power lines go after offloading floor (ground layout and coordinates attached), by loading up the roadbed is electric line to be high with high the lowest level of 10m.