to avoid the sticky glue on the carousel so workers had to use data "Reform 300 + CO / 300 1M * 1.45M" (for counter) to make pads for the shoes being put through the presses.
Is this used medium average 1-2 days (maximum of 1 week), change (as it is difficult to clean, and dust stick to the shoe material)
this situation does not waste material but more effective, more per should pass more than 10 sheets
đang được dịch, vui lòng đợi..
