1) Option 1: Narrow road embankment
Contractor will conduct excavation, embankment road within the premises to be handed over and the roof of the talus will be translating into the center of the road, will ensure the talus foot coincides with the boundary clearance (attach detailed drawing.)
This option has the advantage of not losing more material reinforced slope and incurred costs. However, the plan has the drawback is the pavement will not load handling soft soil in full, leading to extra load after all the work site.
đang được dịch, vui lòng đợi..