About the complete profile for wall ~ CRW21 CRW14 ITP.I was conducted to check the progress of work of the specific track 3 as follows:1. The transport of the pile I have seen Mr. Acidosis (Engineer Track 3) currently receive the guidance of Mr. Peace QC team and are conducting classified the pile and attached to each section. Expected to be completed in the next two days.2. Replacement Parts. SCQC has signed all the complete profile.Rest 2 layers in the CRW21 are conducting test in addition to the school. Expected to complete in the next two days.