With the drilling survey, based on survey documents that you have (with conditions still ensuring legality), we confirmed eligibility for the design.
But if in the case of additional drilling, the block most of the 02 drill holes (01 buildings nose between B3 and Garage; 01 nose between buildings B1 and B2). the cost for this is not so 50.000.000VND. We will try our best for this not to happen.
đang được dịch, vui lòng đợi..