Electricity - the actual production average annual tuabin wind: MWh 6.473,4 / year- power factor (coffee): 36,9%- tmax:3.237 hours / year- Tel: p75 production / year = 283.144,0mwh corresponds to 34,9 coffee =%P90 assault gun 268.544,0mwh / year = corresponding coffee = 33, L%The calculation results 3.1.3.3 the first phase: 132mw - 66 tuabinThe calculation results of wind power plant green energy - Bac Lieu (phase 1) power 132mw scale, the main parameters are as follows:- wind power farm: 132mw- tuabin tuabin number: 66Does not include the power loss per year and the efficiency of the farm layout: 427.244,0mwh / year of wind- effective layout for 91,7 wind farm:%Electricity - production per year to the farm layout performance (taking into account the impact of wind, covering 391.783,0mwh / year):Electricity - the actual output per year to be lost 16%:p50 = MWh 329.098,0 / yearElectricity - the actual production average annual tuabin wind: MWh 6.473,4 / year- power factor (coffee): 36,9%- tmax:3.237 hours / year- Tel: p75 production / year = 311458,0mwh corresponds to 34,9 coffee =%P90 assault gun 296.398,0mwh / year = corresponding coffee = 33, L%
đang được dịch, vui lòng đợi..